Urban Mining
Sustainability certificate dated 24.11.2026 for the project Gutleutstraße 7-11, Frankfurt am MainCircularity Certificate
During the dismantling works at Gutleutstraße 7-11 in Frankfurt, we removed 878 m² of calcium sulphate raised floor panels and passed them on for reuse. The panels are refurbished and tested by Mobius industrie and then installed again. This saved 41.1 tonnes of waste and reduced CO2 emissions by 24.2 tonnes (according to EN 15804).